1.   PURPOSE

This Standard Operating Procedure establishes the minimum requirements for the safe unloading of wooden glass cases from a shipping container mounted on a transport trailer at the Rossen Glass & Mirror Ltd. facility. Glass cases are heavy, top-heavy, and contain fragile product — an uncontrolled case shift or fall can cause severe or fatal injury. The trailer introduces additional hazards: suspension movement during unloading, an elevated working surface, and a load that must be kept balanced from the centre outward to prevent the trailer from becoming unstable. This SOP ensures that all unloading is performed in a controlled, planned, and sequenced manner using the overhead crane with a spread bar and metal lifting cables, with strict exclusion zone enforcement and proper case securing throughout.

2.   SCOPE

This SOP applies to all unloading of wooden glass cases from a shipping container on a transport trailer backed into the Rossen Glass & Mirror Ltd. shop bay. It covers the truck driver's role, the overhead crane unloading process, the centre-outward alternating unloading sequence required to maintain trailer balance, the management and securing of remaining cases throughout the operation, and the control of all personnel access to the unloading area.

3.   AUTHORISATION — WHO MAY PARTICIPATE

Participation in a container unloading operation is restricted. Only the following personnel may be within the unloading area or directly involved in the operation:

All other employees, visitors, and contractors must remain outside the 12-foot (3.6 m) exclusion zone or behind the designated wall barrier. There are no exceptions. The supervisor leading the unloading is responsible for enforcing this at all times.

4.   RESPONSIBILITIES

Supervisor / Lead Unloader

Truck Driver

Crane Operator

All Participating Employees

5.   HAZARDS & RISK SUMMARY
HazardPotential HarmControls
Glass case tipping or fallingCrush injury, fatality, severe lacerationExclusion zone; secure remaining cases at all times; planned sequence
Cases shifting inside container during liftDomino effect — multiple cases fallingSecure all adjacent cases with straps before any lift begins
Crane load swinging inside containerCollision with cases or personnel, destabilisationSlow crane speed; guide with tag line; no sudden movements
Cable not properly attached to case before liftCase slipping free — dropped load, crush injury or fatalityTwo-person cable check mandatory before every lift; no lift without supervisor confirmation
Spread bar or cable failure mid-liftCase dropped — crush injury or fatalityPre-use inspection of spread bar, cables, and hooks before every operation
Cables removed before case is secured on rackUnsecured case tipping off rackCase must be fully placed, stable, and strapped to rack before cables are detached
Personnel inside exclusion zoneStruck by falling case or swinging load12-foot exclusion zone enforced before and throughout unloading
Trailer suspension movement during unloadingUnexpected case shift or loss of balanceTrailer chocked; unload centre-outward, alternating sides; monitor trailer stability
Trailer becoming imbalancedTrailer tipping, cases fallingStrict centre-outward alternating sequence maintained at all times
Opening container doors — unsecured loadCases falling out when doors openedInspect before opening; open one door cautiously from the side, never from the front
Poor lighting inside containerFailure to see case condition or cable attachment pointsUse portable lighting; do not enter a poorly lit container
Cuts from protruding fasteners, banding, or cable endsLaceration to handsGloves highly recommended whenever handling cases, cables, or banding
Struck by falling overhead debris or swinging spread barHead injuryHard hat highly recommended; keep clear of spread bar swing radius
Truck driver in unloading areaStruck by case or crane loadDriver stays in cab or behind exclusion zone for the entire operation
6.   PERSONAL PROTECTIVE EQUIPMENT (PPE)
PPE ItemWhen RequiredStatus
Steel-toed safety footwear (CSA Grade 1)At all times during the operationMANDATORY
Hard hatThroughout the entire unloading operationHighly Recommended
Safety glasses / gogglesThroughout the entire unloading operationHighly Recommended
Cut-resistant gloves (ANSI A4 minimum)Whenever handling cases, straps, or bandingHighly Recommended
High-visibility vestWhen other shop floor operations are running concurrentlyHighly Recommended
7.   EXCLUSION ZONE
⚠   12-FOOT (3.6 m) EXCLUSION ZONE — ENFORCED BEFORE CONTAINER DOORS OPEN   ⚠

The exclusion zone is the single most important safety control in this operation. A falling glass case can travel, bounce, or slide well beyond the footprint of the container. The exclusion zone must be established and communicated before the container doors are opened — not after.

⚠ WARNING: Do NOT allow anyone to enter the exclusion zone to "quickly grab something" or to watch the operation from close range. A case that begins to fall gives no warning and no time to move. The zone boundary is the safety line — it is never negotiable.
8.   PRE-UNLOADING PREPARATION
1
Supervisor inspects the load and accepts or rejects itBefore the exclusion zone is established or any unloading begins, the supervisor inspects the exterior of the container and the visible condition of the cases. The supervisor checks for signs of damage to the container walls, doors, or cases — including crushed or broken boards, water damage, evidence of shifting, or cases that are leaning. Based on this inspection, the supervisor either accepts the load and proceeds with unloading, or rejects it and contacts the appropriate party to address the damage claim before any cases are moved. Unloading does not begin until the supervisor has made and communicated this decision.
2
Brief all participantsBefore any equipment is moved, the supervisor briefs all participating employees on the unloading plan: the centre-outward alternating sequence, each person's role, the exclusion zone boundaries, the cable attachment confirmation protocol, and the stop signal. Confirm everyone understands before proceeding.
3
Direct the driver to the cabOnce the driver has broken the seal and opened the container doors, direct the driver to return to the truck cab. Confirm the driver is in the cab or beyond the exclusion zone before any further steps are taken. The driver does not re-enter the area until given the all-clear by the supervisor at the end of unloading.
4
Establish and mark the exclusion zonePlace cones, tape, or barriers to mark the 12-foot exclusion zone around the trailer and container opening. Communicate the zone to all shop floor employees not participating in the operation — they must remain outside it or behind the wall barrier for the entire operation.
5
Inspect the spread bar and cablesBefore every unloading operation, inspect the spread bar for cracks, bends, or deformation. Inspect every metal cable for kinks, fraying, broken strands, or worn ends. Inspect all hooks and shackles for cracks, distortion, and functioning safety latches. Any defect is an immediate out-of-service condition — do not use until repaired or replaced.
6
Complete the crane pre-use inspectionThe crane operator must complete a full crane pre-use inspection per SOP EQ-CRANE-001. Confirm the crane hoist, hook, and controls are all in good working order. Do not begin unloading if any crane fault is found.
7
Position the crane above the container openingPosition the overhead crane so it is aligned directly above the container entrance and ready to lower the spread bar into the container without obstruction. Confirm the travel path to the landing zone (rack) is clear of people and obstacles.
8
Inspect the container interior before entryWith the doors open, visually inspect the interior from outside the container. Confirm lighting is adequate — use a portable light if needed. Note the arrangement and condition of all cases, identify any that appear damaged or leaning, and plan the centre-outward alternating sequence based on what you see. Do not enter the container until the supervisor confirms it is safe.
9
Secure all cases not immediately being movedBefore the first lift, inspect the securing condition of every case in the container. Any case not already secured by internal bracing or original packing straps must be strapped before the adjacent case is moved. This check is repeated before every subsequent lift.
10
Confirm the rack and landing zone are readyConfirm the receiving rack is in position, clear, and ready to accept the first case before any lifting begins. Never lift a case without a prepared, confirmed landing zone.
9.   UNLOADING PROCEDURE

Cases are unloaded one at a time using the overhead crane with a spread bar and metal lifting cables. The unloading sequence is centre-outward, alternating ends — one case from the far end of centre, then one from the near end of centre, working outward toward the container doors. This sequence is mandatory to maintain trailer balance throughout the operation. Deviation from this sequence requires supervisor approval.

9.1   Unloading Sequence — Centre-Outward, Alternating Sides
1
Identify the centre of the loadBefore the first lift, the supervisor identifies the centre case or centre pair of cases and establishes the unloading sequence from that point outward toward the container doors. This sequence is communicated to all participants before work begins.
2
Alternate ends with every liftRemove one case from the far end of centre, then one from the near end of centre, then the next far, then the next near — working outward toward the container doors with each pair. Never remove two consecutive cases from the same end without first removing the equivalent case from the opposite end.
3
Monitor trailer balance throughoutAfter each lift, observe the trailer for any sign of lean, settling, or instability before proceeding to the next case. If the trailer appears to be leaning or the suspension seems uneven, stop and consult the supervisor before continuing.
9.2   For Each Case — Before the Lift
1
Confirm the exclusion zone is clearBefore each and every lift, confirm no unauthorised person is within the 12-foot exclusion zone. Do not proceed until the zone is clear and the truck driver is confirmed in the cab.
2
Verify remaining cases are securedConfirm all cases adjacent to the one being lifted are secured by original bracing or strap. If any adjacent case is unsecured, stop and strap it before proceeding. This check is mandatory before every single lift.
3
Assess the case conditionInspect the wooden case for broken boards, bowing sides, damaged lifting points, or visible glass breakage. A structurally compromised case may not hold the cable attachment under load or may break apart mid-lift. Do not lift a damaged case without supervisor approval and a safe plan.
4
Lower the spread bar into positionLower the spread bar into the container above the case, positioning it so cables will attach squarely and symmetrically to the case's designated lifting points on both sides. The spread bar must be centred over the case so the load will hang level.
5
Attach the cables to the case — confirmation from both endsOne employee attaches the cable hook at each end of the case. Each person is responsible for their own end: confirm the hook is fully seated on the lifting point, the safety latch is closed, the cable is not twisted or crossed, and the attachment point on the case is sound. Each employee then calls out their confirmation directly to the crane operator — "Far end good" / "Near end good" or pre-agreed equivalent signals. The crane operator does not raise the case until a clear verbal confirmation has been received from both ends. If either person is not satisfied with their attachment, they say so and the issue is resolved before any lift attempt.
9.3   Performing the Lift and Move
1
All personnel clear before liftingOnce the cables are confirmed, all employees must step back and clear of the case before it is raised. No one stands beside, behind, or over a case that is about to be lifted. The crane operator calls "Case going up" and waits for a clear acknowledgement before raising.
2
Take up the slack slowlyRaise the crane hoist slowly until the cables are taut but the case has not yet left the trailer floor. Pause and confirm the spread bar is level and all cables are equally loaded. If one end appears to be taking more load than the other, lower, reposition the spread bar, and recheck the cable attachments.
3
Test lift — raise only a few centimetresRaise the case just 5–10 cm off the trailer floor and pause. Confirm the case is hanging level and stable, the spread bar is not tilting, and no adjacent cases have shifted. If anything looks wrong, lower immediately and investigate before proceeding.
4
Raise to minimum clearance heightRaise the case only as high as needed to clear the container door frame and any obstacles in the travel path. Keep the load as low as safely possible throughout the move.
5
Move slowly — no sudden starts or stopsTravel the crane at the lowest safe speed. Sudden movements cause the case and spread bar to swing, risking collision with remaining cases or personnel. Smooth, deliberate movement at all times.
6
Guide with a gloved hand or tag line onlyIf the case needs to be steered into final position, use a gloved hand on the case body or a tag line. Never use your body to stop a swinging case. No one stands in the path of a moving or swinging load.
7
No one under the case at any timeNo employee may stand under a suspended case at any point — not to check the landing zone, not to guide it, not for any reason. Maintain the 12-foot exclusion zone for the full duration of every lift.
9.4   Setting Down and Securing the Case
1
Confirm the rack is readyBefore lowering, confirm the receiving rack is correctly positioned, clear, and ready to accept the case. Do not lower a case onto an unprepared or obstructed rack.
2
Lower slowly — keep hands and feet clearLower the case slowly and steadily onto the rack. All hands and feet must be clear of the pinch zone between the case base and the rack. Use a tag line or guide stick for final alignment rather than bare hands under the case.
3
Confirm the case is fully and stably seated on the rackThe case must be resting fully and squarely on the rack — not balanced on an edge or corner, not leaning. If it is not fully stable, raise slightly, reposition, and lower again.
4
Place both securing bars before removing cablesBefore the cables are detached, both securing bars must be slid into position across the rack to hold the case. Confirm both bars are fully seated and engaged. Do not remove the lifting cables until both bars are in place — the bars are the only thing preventing the case from tipping once the cables are released.
5
Remove the cables only after both bars are confirmed in placeOnce both securing bars are in position and confirmed, detach each cable hook from the case. Confirm all hooks are fully clear, then raise the spread bar clear of the case and rack before moving the crane back to the container.
⚠ WARNING: Cables must NEVER be removed from a case before both securing bars are in position on the rack. An unsecured case can tip without warning the moment the cables are released. Bars in place first — cables off second, every single time.
10.   SECURING CASES INSIDE THE CONTAINER

As cases are removed, the remaining cases become progressively less supported by their neighbours. Active securing of remaining cases is one of the most critical controls in this operation.

NOTE: A strap on a case costs 60 seconds. A fallen case costs far more. When in doubt about whether a case needs strapping — strap it.
11.   POST-UNLOADING PROCEDURE
1
Confirm all cases are safely placed and securedOnce the last case is removed, do a walk-around to confirm every placed case is stable and secured in its new location. No case should be free-standing without lateral support or a strap.
2
Inspect the container interiorEnter the empty container and inspect for remaining product, dunnage, broken glass, or debris. Remove any glass fragments carefully — wear gloves and safety glasses. Do not leave debris in the container.
3
Close and secure the container doorsClose and latch the container doors, then give the all-clear to the driver to pull out of the bay.
4
Remove exclusion zone markingsRemove cones, tape, or barriers used to mark the exclusion zone once the operation is fully complete and all cases are secured.
5
Park and shut down the craneReturn the crane to its parked position. Lower the spread bar to a safe resting position and stow the cables neatly. Power down the crane per SOP EQ-CRANE-001.
6
Clean up the areaSweep and clear any dunnage, packing material, banding, or debris from the unloading area. Glass fragments or dust on the floor are a slip and laceration hazard — clean thoroughly.
12.   EMERGENCY PROCEDURES

If a case begins to tip or fall:

If a cable, hook, or spread bar appears to be failing during a lift:

If an injury occurs:

13.   TRAINING & AUTHORISATION

Only the following employees may participate in a container unloading operation:

14.   REFERENCES & RELATED DOCUMENTS
15.   ACKNOWLEDGEMENT & SIGN-OFF

By signing below, all parties confirm they have read, understood, and agree to comply with this Standard Operating Procedure.